Jeffco DW HVAC Upgrade Project - Edgewater, Elk Creek, Peck, Secrest, and Thomson Elementary Schools

Columbine Engineering was the Prime Consultant for this multi-school project upgrading the HVAC systems at Edgewater, Elk Creek, Peck, Secrest, and Thomson Elementary Schools.

Scope

Mechanical Engineering

Location
Edgewater, Elk Creek, Peck, Secrest, and Thomson Elementary Schools
Affected Area
(5) schools (210,000 sqft)
Construction Cost
$3,525,000
Building Details
Our Services

Columbine Engineering was the Prime Consultant for this multi-school project upgrading the HVAC systems at Edgewater, Elk Creek, Peck, Secrest, and Thomson Elementary Schools. The scope varied at each school, Edgewater was a boiler and control system upgrade, Elk Creek was a AHU and RTU replacement, Peck was a boiler replacement, Secrest was an air cooled chiller replacement, and Thomson Elementary was replacement of (16) RTUs. As the Prime Consultant, we managed the architectural and structural consultants.

Let’s Get Started

Reach out to us to discuss your project scope and needs.