We provided mechanical and electrical engineering for the replacement of the (2) 250 MBH cast iron sectional boiler with (2) new high efficiency condensing boilers.

Scope

Mechanical Engineering

Location
2401 E 37th Ave, Denver, CO 80205
Affected Area
Building Heating Water System (60,000 sqft)
Construction Cost
$830,000
Building Details
Our Services

Columbine Engineering was the Prime Consultant working under US Engineering for this Design-Build project. We provided mechanical and electrical engineering for the replacement of the (2) 250 MBH cast iron sectional boiler with (2) new high efficiency condensing boilers. A new control system was added for this project, as well as the replacement of system accessories including air separator, expansion tank, filter feeder, etc… are also part of this project.